Media Summary: Learn about how a new haul rope was installed for the The History: Installed in 1997, this much needed lift replaced the Killington Peak Double, a Hall double modified over the years.
Capital Improvement K 1 Gondola - Detailed Analysis & Overview
Learn about how a new haul rope was installed for the The History: Installed in 1997, this much needed lift replaced the Killington Peak Double, a Hall double modified over the years.