Media Summary: Utilizing the 2 1/2 Combat Ready Attack line In this video, Kevin and the guys demonstrate the expectations if we have an emergency at a location where we need to utilize a ... Training Minutes: Sean Gray is joined by Los Angeles County (CA) Captain Chad Christensen, who explains his department's ...

Highrise Drill Interior Operations Pl - Detailed Analysis & Overview

Utilizing the 2 1/2 Combat Ready Attack line In this video, Kevin and the guys demonstrate the expectations if we have an emergency at a location where we need to utilize a ... Training Minutes: Sean Gray is joined by Los Angeles County (CA) Captain Chad Christensen, who explains his department's ... Kevin explaining the thinking and actions behind a driver/ KFR has developed a system for the first-in engine company on a confirmed structure fire in a Training Minutes: Denver (CO) Assistant Chief Dave McGrail discusses

High Rise Drill - Part 1 - E-449 arriving Here are the steps that we utilize here at Menlo Park Fire to perform a In this video, TRFA 156 will take you through the process of doing a hose lay in a Dave McGrail discusses the importance of sizing up the apartment door and making adjustments to your hose stretch based on ... Proper method of folding the Combat Ready

Photo Gallery

Highrise drill interior operations (PL)
High Rise Operations - Interior
High-Rise Evolution - 2" Interior Hallway Deployment
High Rise - Fire Floor Ops
2 1/2" Hose Operations In HighRise Buildings Part 3
Door Control and Interior Operations
High Rise Operations - Driver/Operator Duties
High Rise -  KFR First-In Engine Company
High-Rise Drill All-Risk
High-Rise Ops: The Apartment Stretch
High Rise Drill - Part 1 - E-449 arriving
Hose Operations: Highrise Pull
Sponsored
Sponsored
View Detailed Profile
Highrise drill interior operations (PL)

Highrise drill interior operations (PL)

Utilizing the 2 1/2 Combat Ready Attack line

High Rise Operations - Interior

High Rise Operations - Interior

In this video, Kevin and the guys demonstrate the expectations if we have an emergency at a location where we need to utilize a ...

Sponsored
High-Rise Evolution - 2" Interior Hallway Deployment

High-Rise Evolution - 2" Interior Hallway Deployment

This 2"

High Rise - Fire Floor Ops

High Rise - Fire Floor Ops

This video take a focused look at FWFD's

2 1/2" Hose Operations In HighRise Buildings Part 3

2 1/2" Hose Operations In HighRise Buildings Part 3

Continuation of 2 1/2" Hose

Sponsored
Door Control and Interior Operations

Door Control and Interior Operations

Training Minutes: Sean Gray is joined by Los Angeles County (CA) Captain Chad Christensen, who explains his department's ...

High Rise Operations - Driver/Operator Duties

High Rise Operations - Driver/Operator Duties

Kevin explaining the thinking and actions behind a driver/

High Rise -  KFR First-In Engine Company

High Rise - KFR First-In Engine Company

KFR has developed a system for the first-in engine company on a confirmed structure fire in a

High-Rise Drill All-Risk

High-Rise Drill All-Risk

When a

High-Rise Ops: The Apartment Stretch

High-Rise Ops: The Apartment Stretch

Training Minutes: Denver (CO) Assistant Chief Dave McGrail discusses

High Rise Drill - Part 1 - E-449 arriving

High Rise Drill - Part 1 - E-449 arriving

High Rise Drill - Part 1 - E-449 arriving

Hose Operations: Highrise Pull

Hose Operations: Highrise Pull

Here are the steps that we utilize here at Menlo Park Fire to perform a

Learn Interior Fire Attack in a High-Rise Building: TRFA 156's POV

Learn Interior Fire Attack in a High-Rise Building: TRFA 156's POV

In this video, TRFA 156 will take you through the process of doing a hose lay in a

High Rise - Water Operations

High Rise - Water Operations

This is the second video in our

High Rise Ops: Door Size-Up #4347210169001

High Rise Ops: Door Size-Up #4347210169001

Dave McGrail discusses the importance of sizing up the apartment door and making adjustments to your hose stretch based on ...

VEIS drill #1. (PL).

VEIS drill #1. (PL).

Vent Enter Isolate Search

Highrise Pack "Attack Line Load" (PL)

Highrise Pack "Attack Line Load" (PL)

Proper method of folding the Combat Ready

High Rise Size-Up

High Rise Size-Up

Presented by LA County Fire Training.