Media Summary: This is the second floor pour. 900 Cubic Yard of Concrete. 19 hour day! The Fab Shop kept the lights on all weekend to push a hot Shown is the process I'm using to prepare for the steel and fabric airplane
Fcc Construction Inc Hangar Project Week 1 - Detailed Analysis & Overview
This is the second floor pour. 900 Cubic Yard of Concrete. 19 hour day! The Fab Shop kept the lights on all weekend to push a hot Shown is the process I'm using to prepare for the steel and fabric airplane